Wisteria vines weave through a mahogany-and-stainless-steel trellis supported by powder-coated steel poles on one side and concrete pillars on the other. Bill Brown Construction Company executed the structural concrete, and Drummond Masonry installed the pavers made from Pietra Piasentina, the same limestone used inside.